TM 5-3805-255-14
0082
INSTALLATION CONTINUED
0082
4. Install return pipe (Figure 4, Item 8), flange (Figure 4, Item 6), and four bolts (Figure 4, Item 5) on boom
cylinder (Figure 4, Item 7).
5. Install bolt (Figure 4, Item 11) and nut (Figure 4, Item 12) on boom cylinder (Figure 4, Item 7).
6. Install two new O-rings (Figure 4, Items 2 and 4) in two hydraulic lines (Figure 4, Items 1 and 3).
7. Install two hydraulic lines (Figure 4, Items 1 and 3), four split-flange collars (Figure 4, Item 9), and eight flange
bolts (Figure 4, Item 17) on boom cylinder (Figure 4, Item 7).
8. Install two weatherseal clamps (Figure 4, Item 10), washers (Figure 4, Item 16), bolts (Figure 4, Item 15),
washers (Figure 4, Item 14), and new locknuts (Figure 4, Item 13) on boom cylinder (Figure 4, Item 7).
Figure 4. Hydraulic Lines.
0082
0082-6