TM 5-3805-257-14&P
MAINTENANCE ALLOCATION CHART - CONTINUED
(5)
(6)
(3)
(4)
(2)
(1)
Maintenance category
Tools
Maintenance
and
Group
C
F
H
D
Remarks
O
function
Component/Assembly
number
eqpt
ELECTRICAL SYSTEM -
06
CONTINUED
1
Inspect
Chassis Wiring Harness
0.1
0613
Test
1.0
2.5
Replace
1.0
Repair
TRANSMISSION
07
Transmission Shifting
0705
1
Components
1.5
Replace
1.5
Rod Assembly
Replace
1.5
Repair
0708
1
Coupling
5.0
Replace
9.5
Repair
1
0.2
Inspect
Transmission Assembly
0710
0.5
Service
8.0
Replace
8.0
Repair
21.0
Overhaul
21.0
Case Assembly
Replace
12.0
Clutch Assemblies
Replace
0.2
Mounting Hardware
Inspect
1.0
Replace
1
Coolers, Pumps, Motors
0721
1.5
Cooler, Oil Filter Assembly
Replace
0.3
Service
0.5
Replace
0.3
Repair
1
6.0
Replace
0725
PROPELLER, PROPELLER
09
SHAFTS, UNIVERSAL
JOINTS, COUPLER AND
CLAMP ASSEMBLY
1
Propeller Shafts
0900
Inspect
0.1
0.5
Service
Bearing to Front Axle
1.5
Replace
1.0
Repair
Inspect
0.1
0.5
Service
sion to Rear Axle
1.5
Replace
1.0
Repair
B-7
Change 1