TM 5-3805-258-24-2
Section II. MAINTENANCE ALLOCATION CHART
(4)
MAINTENANCE LEVEL
GROUP
MAINTENANCE
UNIT
~~
TOOLS &
IJUMBER. .COMPONENT/ASSEMBLY
FUNCTION
s - EpOT
EQUIP
REMARKS
(1)
(2)
(3)
c
0
F
H
D
(5)
(6)
1208
Air Brake Reservoir
Inspect
0.2
(cont)
Service
0.1
1
Replace
0.8
2
Pressure Protection Valve
Replace
0.8
1
Repair
0.5
1
Double Check Valve and
Replace
0.8
1
Stop Light Switch
Repair
0.5
1
1209
Air Compressor Assembly:
Replace
1.0
2
Repair
1.0
2
Governor
Adjust
0.8
1
Replace
0.8
2
Repair
1.0
2
13
WHEELS
1311
Wheel Assembly
Replace
1.0
2
Repair
1.5
2,5
1313
Tires
Inspect
0.1
Service
0.2
0.3
2,4
Replace
2.0
2,4
Repair
1.0
2,4
14
STEERING
1407
Power Steering Gear
(& Steering Column)
Replace
2.0
2
Repair
3.0
2
Adjust
1.5
1
1410
Aux/Emergency Steering
Replace
0.8
2
Motor and Pump
Repair
2.0
2
Test
1,0
3
1411
Steering Hoses, Lines &
Inspect
0.2
Fittings (Articulation):
Replace
2.5
2
Filter Assembly, Oil
Service
0.3
3
Replace
0.3
3
1412
Steering Cylinder
Replace
1,0
2
Assemblies
Repatr
2,0
2
1414
Flow Control Valve
Replace
0.8
2
Repair
3.0
2
Adjsut
0.8
1
15
FRAME TOWING AllACH-
MENTS, DRAWBARS AND
ARTICUIATION SYSTEM
1501
Rear Chassis Assembly
Repair
0.3
2,5
(Engine End)
B-8