TM 5-3805-262-20
SECTION II. MAINTENANCE ALLOCATION CHART
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
MAINT LEVEL
TOOLS &
NUMBER
FUNCTION
UNIT
INTMED
EQUIP.
REMARKS
(1)
(2)
(3)
c
o
F
H
D
(5)
(6)
0613
Hull or Chassis Wiring
Front Wiring Harness
Inspect
0.1
Test
1*O
2
Replace
7,0
1,5
Repair
1.0
1,2,3,4
Rear Wiring Harness
Inspect
0.1
Test
1.0
1,2,3
Replace
2.0
1,5
Repair
1.0
1,2,3
Cab Wiring Harness
Inspect
0.1
Test
1.0
1,2,3
Replace
1.0
1,5
Repair
1.0
1,2,3,4
07
Transmission
0708
Torque Converter
Repair
9.0
1,5
Assembly (Intergral
with transmission)
0710
Transmission & Mounting
Assembly
Transmission
Inspect
0.2
Service
0.5
1,2
Replace
10.0
1,5
Repair
8.0
1,5
Overhaul
25.0
1,5
0714
Control Valves and
Linkage
Control Valves
Test
0.5
8
Replace
1.0
1,5
Repair
2.0
1,5,6
Overhaul
3.0
1,5,6
Control Linkage
Adjust
1.0
1,2,3,4
Replace
1.0
1,2,3,4
* MAINTENANCE LEVELS:
C-OPERATOR/CREW
=
uNIT
F-INTERMEDIATE DIRECT SUPPORT
D - DEPOT
O-ORGANIZATIONAL
H. INTERMEDIATE GENERAL SUPPORT
B-9