TM 5-3805-290-23-2
TRANSMISSION AND TORQUE CONVERTER REPLACEMENT - CONTINUED
0176 00
TRANSMISSION REMOVAL - CONTINUED
24.
Remove four lower bolts (49) and washers (50) on
both sides of transmission.
427-B0420
N OT E
Check clearance of muffler and ejector pipe.
25.
Use lifting equipment to raise transmission approxi-
mately 2 in. (51 mm) from mounts. Position wood
block under flywheel housing. Allow engine to rest on
wood block.
26.
Remove three bolts (51), washers (52), and bracket
(53) from mount (54).
427-B0421
0176 00-8