• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION CONTROL VALVE REPLACEMENT - CONTINUED
TRANSMISSION OIL PUMP REPLACEMENT

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  975    976    977    978    979  980  981    982    983    984    985  
img
. . .
TM 5-3805-290-23-2
TRANSMISSION CONTROL VALVE REPLACEMENT - CONTINUED
0177 00
INSTALLATION - CONTINUED
8.
Install panels (4, 3, 2, and 1) (WP 0110 00 and WP
0107 00).
427-B0438
9.
Close engine door(s) (TM 5-3805-290-10).
10.
Run engine until normal operating temperature is reached (TM 5-3805-290-10).
11.
Verify correct operation of machine (TM 5-3805-290-10).
12.
Shut down engine (TM 5-3805-290-10).
13.
Check fluid level (TM 5-3805-290-10).
14.
Check transmission for leaks.
END OF WORK PACKAGE
0177 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.