• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SERVICE BRAKE LINES AND HOSES REPLACEMENT - CONTINUED
BRAKE PEDALS REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  307    308    309    310    311  312  313    314    315    316    317  
img
. .
TM 5-3805-291-23-2
SERVICE BRAKE LINES AND HOSES REPLACEMENT - CONTINUED
0117 00
INSTALLATION - CONTINUED
46.
Install two new O-rings (9) and fittings (3) on
partition (8).
47.
Install two new O-rings (9) and connect hoses
(6 and 5) to fittings (3). Install all associated clips,
clamps, and new tiedown straps.
48.
Install two O-rings (4) and connect hoses (2 and 1) to
fittings (3).
49.
Install fittings and connect hoses to service brake control valve (WP 0116 00). Install all associated clips, clamps, and
new tiedowns straps.
50.
Fill hydraulic tank (WP 0148 00).
51.
Operate machine and verify correct operation (TM 5-3805-291-10).
52.
Shut down engine (TM 5-3805-291-10).
53.
Check for leaks.
54.
Close hydraulic filter access door (TM 5-3805-291-10).
END OF WORK PACKAGE
0117 00-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.