• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CAB LINERS AND DOME LIGHT REPLACEMENT - CONTINUED
CAB LINERS AND DOME LIGHT REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  489    490    491    492    493  494  495    496    497    498    499  
img
TM 5-3805-291-23-2
CAB LINERS AND DOME LIGHT REPLACEMENT - CONTINUED
0138 00
INSTALLATION - CONTINUED
3.
Install lower side panel (17) and three bolts (16) in
cab.
427-C1073
4.
Position upper side panel (12) in cab.
5.
Install lamp (15) in upper side panel (12) and connect
lamp to machine.
6.
Install two vents (14) and four screws (13) on upper
side panel (12).
7.
Install four bolts (11) on upper side panel (12).
8.
Repeat steps 3 thru 7 for opposite side of cab.
427-C1072
0138 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.