• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIFT CYLINDERS REPLACEMENT - CONTINUED
LIFT CYLINDERS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  585    586    587    588    589  590  591    592    593    594    595  
img
.
TM 5-3805-291-23-2
LIFT CYLINDERS REPLACEMENT - CONTINUED
0153 00
INSTALLATION - CONTINUED
N OT E
Lubricate bores and pins with grease before installation.
Pump and puller is assembled from Items 45, 43, 52, 56, 82, and 94 (WP 0232 00).
2.
With assistance, use hydraulic pump and puller assem-
bly to install pin assembly (7) in lift cylinder (3).
427-C0439
3.
Install washer (9), spacer (10), and bolt (8) in pin
assembly (7).
4.
Install grease fitting (6) in pin assembly (7).
427-C0438
0153 00-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.