• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPLACEMENT - CONTINUED
ENGINE REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  777    778    779    780    781  782  783    784    785    786    787  
img
TM 5-3805-291-23-2
ENGINE REPLACEMENT - CONTINUED
0171 00
INSTALLATION - CONTINUED
17.
If equipped with arctic heater, turn valve (78) to ON
position.
18.
Connect hose (77) to valve (75) and tighten clamp
(76).
19.
Turn valve (75) to ON position.
20.
Connect wiring harness lead (73) to engine wiring har-
ness (74).
427-C0496
21.
Place two new gaskets (71) and two tubes (70) on
manifold (72).
22.
Install eight washers (69) and bolts (68) on two tubes
(70).
427-C0495
0171 00-31


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.