TM 5-3805-291-23-2
CAB WIRING HARNESS AND FUSE/RELAY BLOCK REPLACEMENT - CONTINUED
0195 00
INSTALLATION - CONTINUED
5.
Install four clamps (57) on worklight harness (58).
6.
Install four washers (56) and bolts (55) on clamps (57).
7.
Install two ground connections (54), washer (53), and nut (52) on machine.
8.
Install new tiedown strap (51) on upper cab wiring harness (8).
427-C1436
0195 00-16