TM 55-07/NAVSEA OP 3221 Rev 2
Figure 7-37. Construction details for closed deck-stow structure.
passed over the construction and secured with turnbuckles. Only appropriatepadeyes or lashing points will be used for
this purpose; guardrails or other structures not specifically designated as lashing points will not be used. A closed deck-
stow structure under construction is illustrated in figure 7-38.
7-44