• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Electrical Connector.
AIR CLEANER PRIMARY AND SECONDARY ELEMENTS REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  140    141    142    143    144  145  146    147    148    149    150  
img
. .
TM 5-2420-231-23-2
0100
INSTALLATION CONTINUED
12. Connect hose (Figure 13, Item 3) to air cleaner assembly (Figure 13, Item 1) and tighten clamp
(Figure 13, Item 2).
Figure 13. Aspirate Check Valve Hose.
0100
END OF TASK
FOLLOW-ON TASKS
00100
1. Install hood plate (WP 0303).
2. Install air cleaner primary and secondary elements (WP 0101).
END OF TASK
END OF WORK PACKAGE
0100-9/(10 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.