12. Install eyelet (Figure 22, Item 1) and new locknut (Figure 22, Item 2) on fuel level sender (Figure 22, Item 4).
13. Install eyelet (Figure 22, Item 5) and new locknut (Figure 22, Item 3) on fuel level sender (Figure 22, Item 4).
14. Position terminal cover (Figure 22, Item 6) on eyelet (Figure 22, Item 5).
Figure 22. Fuel Level Sender.
0154
15. Connect connector (Figure 23, Item 2) to grid heater wiring harness connector (Figure 23, Item 1).
Figure 23. Grid Heater Wiring Harness.