FIELD MAINTENANCE
-
FLOOR MAT REPLACEMENT
0
305
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Estimated Time to Complete
0.1 hr
0
0
0
Equipment Conditions
Machine parked (TM 5-2420-231-10)
0
REMOVAL
0305
1. Remove front floor mat (Figure 1, Item 1) from machine.
2. Remove rear floor mat (Figure 1, Item 2) from machine.
Figure 1. Floor Mats.
0305
END OF TASK
CLEANING AND INSPECTION
0305
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
END OF TASK
INSTALLATION
0305
1. Install front floor mat (Figure 1, Item 1) on machine.
2. Install rear floor mat (Figure 1, Item 2) on machine.
END OF TASK
END OF WORK PACKAGE