4
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
LOWER-LEFT PANEL REPLACEMENT
0
312
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
References - Continued
Tool Kit, General Mechanic's
0
0
Equipment Conditions
Materials/Parts
0
Seal
0
Estimated Time to Complete
References
0.8 hr
0
0
REMOVAL
0312
1. Remove six bolts (Figure 1, Item 1) and washers (Figure 1, Item 2) from lower-left panel (Figure 1, Item 3).
2. Remove lower-left panel (Figure 1, Item 3) from machine.
Figure 1. Lower-Left Panel.
0312