• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Blower Motor.
Figure 6. Blower Housing.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  930    931    932    933    934  935  936    937    938    939    940  
img
. . .
TM 5-2420-231-23-3
0349
REMOVAL CONTINUED
6. With assistance, temporarily install blower housing (Figure 5, Item 3), four washers (Figure 5, Item 2), and
locknuts (Figure 5, Item 1) on roof (Figure 5, Item 4).
Figure 5. Blower Housing.
0349
END OF TASK
CLEANING AND INSPECTION
0349
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0349
NOTE
Have assistant hold blower housing.
1. With assistance, remove four locknuts (Figure 5, Item 1), washers (Figure 5, Item 2), and blower housing
(Figure 5, Item 3) from roof (Figure 5, Item 4). Discard locknuts.
2. Install blower motor (Figure 4, Item 2) and blower motor wiring harness (Figure 4, Item 4) in blower housing
(Figure 4, Item 1).
3. Install new duct tape (Figure 4, Item 3) on blower motor wiring harness (Figure 4, Item 4) and blower housing
(Figure 4, Item 1).
0349-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.