TM 5-3805-255-14
0112
CLEANING AND INSPECTION
000112
1. Clean and inspect all parts thoroughly IAW General Maintenance Instructions (WP 0019).
2. Inspect pinion gears for wear or damage; replace if necessary.
3. Inspect pinion shafts for wear or ridging; replace if necessary.
END OF TASK
ASSEMBLY
000112
1. Install new O-ring (Figure 2, Item 14) on hub (Figure 2, Item 13).
2. Install cup (Figure 2, Item 15) in hub (Figure 2, Item 13).
3. Install bearing (Figure 2, Item 16) and seal (Figure 2, Item 17) on hub (Figure 2, Item 13).
4. Install ring gear hub (Figure 2, Item 20), four lockplates (Figure 2, Item 19), and eight bolts (Figure 2, Item 18)
on ring gear (Figure 2, Item 2).
5. Install ring gear (Figure 2, Item 2) and ring gear hub (Figure 2, Item 20) on planetary carrier (Figure 2, Item 1).
6. Install six cups (Figure 2, Items 5 and 9) on three pinion gears (Figure 2, Item 8).
7. Install six bearings (Figure 2, Items 4 and 10), three retaining rings (Figure 2, Item 7), and spacers (Figure 2,
Item 6) on pinion gears (Figure 2, Item 8).
NOTE
Install all three pinion gears before installing pinion shafts.
8. Install three pinion gears (Figure 2, Item 8) in planetary carrier (Figure 2, Item 1).
NOTE
Chill pinion shafts for ease of installation.
9. Install three pinion shafts (Figure 2, Item 3) and pins (Figure 2, Item 12) in planetary carrier (Figure 2, Item 1).
NOTE
Position nuts to fit inside ID of gasket on planetary carrier.
10. Install three nuts (Figure 2, Item 11) on pinion shafts (Figure 2, Item 3) and torque to 450 lb-ft (610 Nm).
12. Install planetary assembly on front axle (WP 0053).
0112-4