TM 5-3805-258-24-2
POWER TRAIN
DISASSEMBLY AND ASSEMBLY
TRANSMISSION
DISASSEMBLE TRANSMISSION
3150-15
Tools Needed
A B C D E F G H J K
5P9736 Link Bracket
3
1P1863 Pliers
1
FT833 Clamp
2
1P1862 Pliers
1
1P520 Driver Group
1
5P4758 Pliers
1
FT947 Clamp
2
6V2156 Link Bracket
2
1P1864 Pliers
1
8B7551 Bearing Puller
Attachment
1
1.
2.
3.
4.
5.
6.
7.
8.
9.
start by:
a) remove transmission hydraulic control
valve
b) separation of torque converter from trans-
mission
Fasten tooling (A) and a hoist to housing (4) as
shown.
Remove the bolts and elbow (1) from case (2)
and the transfer gear case. If necessary remove
the O-ring seal from the elbow.
Remove bolts (3) and make a separation of the
transmission from the transfer gear case. The
weight of the transmission and case is 340 kg
(750 lb.).
Remove O-ring seals (5) and (6) from housing
(4).
Fasten a hoist to housing (4) with two of tooling
(A) as shown.
Remove bolts (7) and make a separation of the
transmission from case (2). The weight of the
transmission is 293 kg (650 lb.).
Carefully turn the planetary group over so No.
6 (first speed) clutch housing is up.
Use tool (B) and remove ring (9) from the
shaft.
Remove carrier (8).
5-262