6
TM 5-3805-290-23-2
COUNTERWEIGHT REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions
Maintenance Level
Unit
Machine parked on level ground (TM 5-3805-290-
10)
Tools and Special Tools
Work tool lowered to ground (TM 5-3805-290-10)
Parking brake engaged (TM 5-3805-290-10)
Shop equipment, common no. 1 (Item 77, WP 0205
Wheels chocked
Lifting equipment, 750-lb capacity
Battery disconnect switch in OFF position (TM 5-
3805-290-10)
Materials/Parts
Cleaning compound, solvent, type III (Item 9, WP
Drawings Required
TM 5-3805-290-23P, Figure 98
Estimated Time to Complete Task
Personnel Required
1.0 hr
MOS 62B, Construction Equipment Repairer (2)