• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FLOOR MAT INSTALLATION
HEADLINER INSTALLATION - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  505    506    507    508    509  510  511    512    513    514    515  
img
TM 5-3805-290-23-2
CAB LINERS AND MIRRORS REPLACEMENT - CONTINUED
0116 00
HEADLINER INSTALLATION
1.
Install dome lamp (14) in headliner (11).
2.
Place headliner (11) in position, then connect wiring
harness (13) to dome lamp (14).
427-B0874
3.
Install front of headliner (11) in machine.
427-B0875
4.
Install headliner (11) in side rail (12).
427-B0873
0116 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.