• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  618    619    620    621    622  623  624    625    626    627    628  
img
.
TM 5-3805-290-23-2
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0131 00
INSTALLATION - CONTINUED
Lift Arm
1.
Position hose (49) on machine and connect hose to
main control valve (WP 0134 00).
2.
Position clamp (58) and install washer (56), bolt (55),
and nut (57) on clamp.
427-B1130
3.
Install fitting (52) and elbow (44) on bracket (54).
4.
Install new O-ring (53) and connect fitting (50) to fitting (52).
5.
Install new O-ring (51) and connect hose (49) to fitting (50).
6.
Position clamp (47) and install washer (46) and bolt (45) on clamp.
7.
Install new O-ring (48) and connect line (39) to elbow (44).
427-B1129
427-B1128
0131 00-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.