6
TM 5-3805-290-23-2
MAIN CONTROL VALVE HOSES, LINES, AND FITTINGS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Personnel Required
Unit
MOS 62B, Construction Equipment Repairer
Tools and Special Tools
References
Shop equipment, common no. 1 (Item 77, WP 0205
Materials/Parts
Equipment Conditions
Oil, lubricating, OEA-30, Arctic (Item 32, WP
Hydraulic system pressure relieved (TM 5-3805-
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
290-10)
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Drawings Required
TM 5-3805-290-23P, Figures 137 and 140
Estimated Time to Complete Task
O-ring (20)
0.5 hr
WARN I N G
When servicing this machine, performing maintenance, or disposing of hazardous materials, consult
your unit/local hazardous waste disposal center or safety office for local regulatory guidance. If further
information is needed, please contact The Army Environmental Hotline at 1-800-872-3845.
DO NOT disconnect or remove any hydraulic system line or fitting unless engine is shut down and
hydraulic system pressure has been relieved. Tighten all connections before applying pressure. Escap-
ing hydraulic fluid under pressure can penetrate the skin, causing injury to personnel.
At operating temperature, hydraulic oil is hot. Allow hydraulic oil to cool before disconnecting any
hydraulic lines. Failure to follow this warning may result in injury to personnel.
Lubricating/hydraulic oils used in the performance of maintenance can be very slippery. Immediately
wipe up any spills. Failure to follow this warning may result in injury to personnel.
To prevent injury to personnel, wear protective eye covering and gloves.