TRANSMISSION AND TORQUE CONVERTER REPLACEMENT - CONTINUED
TRANSMISSION CONTROL VALVE REPLACEMENT

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  969    970    971    972    973  974  975    976    977    978    979  
img
. . . . . .
TM 5-3805-290-23-2
TRANSMISSION AND TORQUE CONVERTER REPLACEMENT - CONTINUED
0176 00
TRANSMISSION INSTALLATION - CONTINUED
36.
Install four new O-rings (7) in hose assemblies (3, 4,
5, and 6). Connect four hose assemblies to machine.
427-B0407
37.
Install panels (1 and 2) on each side of machine (WP
0110 00).
427-B0406
38.
Install piston pump (WP 0182 00).
39.
Install rear drive shaft (WP 0090 00).
40.
Check hydraulic fluid level (TM 5-3805-290-10).
41.
Refill transmission (WP 0083 00).
42.
Connect arctic heater hose to rear of engine block (WP 0141 00), if equipped.
43.
Start engine (TM 5-380-290-10).
44.
Run engine until normal operating temperature is reached (TM 5-380-290-10).
45.
Verify correct operation of machine (TM 5-380-290-10).
46.
Shut down engine (TM 5-380-290-10).
47.
Check for leaks.
END OF WORK PACKAGE