• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAIN CONTROL VALVE (THREE FUNCTION) REPLACEMENT - CONTINUED
MAIN CONTROL VALVE (THREE FUNCTION) REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1081    1082    1083    1084    1085  1086  1087    1088    1089    1090    1091  
img
TM 5-3805-290-23-2
MAIN CONTROL VALVE (THREE FUNCTION) REPLACEMENT - CONTINUED
0189 00
REMOVAL - CONTINUED
CAU T I ON
Wipe area clean around all connections to be opened during removal. Cap lines and hoses and plug
openings after removing lines. Contamination of system could result in premature failure.
N OT E
Tag hoses prior to removal to
ensure correct installation.
Use a container to catch any fluid
that may drain from hoses or
system. Dispose of fluid IAW local
policy and ordinances. Ensure all
spills are cleaned up.
7.
Disconnect 11 hose assemblies (10) from main control
valve (11).
8.
Remove and discard 11 O-rings (12) from hose assem-
blies (10).
9.
Cut and discard tiedown strap (13) from around wiring
harness (14).
10.
Disconnect all wiring harnesses (14) on main control
valve (11).
427-B0778
11.
Remove tube assembly (15) from main control valve
(11).
12.
Remove and discard two O-rings (16) from tube
assembly (15).
427-B0779
0189 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.