• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COUPLER VALVE REPLACEMENT
COUPLER VALVE REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1089    1090    1091    1092    1093  1094  1095    1096    1097    1098    1099  
img
TM 5-3805-290-23-2
COUPLER VALVE REPLACEMENT - CONTINUED
0190 00
N OT E
Tag hoses prior to removal to ensure correct installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid IAW local policy and
ordinances. Ensure all spills are cleaned up.
REMOVAL
1.
Disconnect five hoses (1) from coupler valve (2).
2.
Remove and discard five O-rings (3) from hoses (1).
3.
Remove two mounting bolts (4) and washers (5) from
coupler valve (2).
4.
Remove coupler valve (2) from machine.
5.
Remove five fittings (6) from coupler valve (2).
6.
Remove and discard five O-rings (7) from fittings (6).
7.
Remove quick coupler solenoid (8) from coupler
valve (2) and set aside for re-use.
427-B1141
0190 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.