• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1148    1149    1150    1151    1152  1153  1154    1155    1156    1157    1158  
img
TM 5-3805-290-23-2
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED
0199 00
REMOVAL - CONTINUED
2.
Remove bolt (4), washer (5), and clamp (6) from
machine and position tube assembly (1) aside.
427-B0576
3.
From left side of machine, disconnect tube assembly
(7) from tube (8). Remove and discard O-ring (9) from
tube assembly.
427-B0577
0199 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.