• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIFT ARMS REPLACEMENT - CONTINUED
LIFT ARMS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1193    1194    1195    1196    1197  1198  1199    1200    1201    1202    1203  
img
TM 5-3805-290-23-2
LIFT ARMS REPLACEMENT - CONTINUED
0201 00
INSTALLATION - CONTINUED
22.
Apply grease to pin assembly (15). Install pin assem-
bly to connect lift cylinder (5) to lift arm assembly (1).
23.
Install spacer (14), washer (13), and bolt (12) on pin
assembly (15).
24.
Position two hose assemblies (11) and install washer
(9) and bolt (8) through two clamps (10).
25.
Repeat steps 22 thru 24 for opposite side of lift arm
assembly.
427-B0649
26.
Install new O-ring (7) in hose assembly (6). Connect
hose assembly to lift cylinder (5).
27.
Install rubber bushing (4) and clamp (3) on lift cylin-
der (5).
28.
Repeat steps 26 and 27 for remaining lift cylinder.
427-B0648
0201 00-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.