TM 5-3805-290-23-2
0207 00
1.
For a metal tube to hose installation, install the tube and tighten all bolts finger tight at rigid end.
2.
Install hose and tighten all bolts finger tight.
3.
Put hose in a position where hose does not make contact with machine or other hoses.
427-B0147
4.
Tighten bolts on both connections to proper torque. Follow the prescribed torque sequence for split-flange connections.
Add measurement of gap (A) to measurement of gap (B). Total must not exceed 0.16 in. (4.0 mm).
5.
Start engine (TM 5-3805-290-10).
6.
Move implement control levers to all positions.
7.
Look at hose during movement of implement. Ensure hose is not making contact with machine or other hoses.
N OT E
For hoses that cross an articulation hitch, check for contact during articulation. For hoses that con-
nect to the steering system, check for contact during steering.
8.
Shut off engine (TM 5-3805-290-10).
9.
If hose contacts other hoses or machine during test, loosen bolts, and reposition hose. Repeat steps 3 thru 8 until there is
no contact.
0207 00-7