• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STOPLIGHT ASSEMBLY AND BRACKET REPLACEMENT - CONTINUED
SERVICE LIGHTS AND FRONT TURNLAMP REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  123    124    125    126    127  128  129    130    131    132    133  
img
. . . . . .
12
TM 5-3805-291-23-2
SERVICE LIGHTS AND FRONT TURNLAMP REPLACEMENT
0071 00
THIS WORK PACKAGE COVERS
Service Light: Removal, Installation
Turnlamp: Removal, Installation
Service Light, Housing Assembly, and Wiring Harness: Removal, Installation
INITIAL SETUP
Maintenance Level
References
WP 0068 00
Unit
Equipment Conditions
Tools and Special Tools
Machine parked on level ground (TM 5-3805-291-
Tool kit, general mechanic's, automotive (Item 90,
10)
WP 0232 00)
Work tool lowered to ground (TM 5-3805-291-10)
Shop equipment, automotive maintenance and
repair: organizational maintenance, common no.
Parking brake engaged (TM 5-3805-291-10)
1 (Item 70, WP 0232 00)
Wheels chocked
Materials/Parts
Battery disconnect switch in OFF position
(TM 5-3805-291-10)
Rag, wiping (Item 35, WP 0233 00)
Bulbs
Drawings Required
Locknut (2)
TM 5-3805-291-23P, Figure 58
Personnel Required
Estimated Time to Complete Task
0.5 hr
MOS 62B, Construction Equipment Repairer
WARN I N G
Ensure battery disconnect switch is in OFF position before performing this task. Failure to follow this
warning may result in injury to personnel or damage to equipment.
0071 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.