• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Battery Box - Continued
Hydraulic Service Box

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  446    447    448    449    450  451  452    453    454    455    456  
img
. . . .
TM 5-3805-291-23-2
CHASSIS GUARD, SIDE PANELS, HYDRAULIC SERVICE BOX, CIRCUIT
BREAKER BOX, AND BATTERY BOX REPLACEMENT - CONTINUED
0133 00
INSTALLATION - CONTINUED
Circuit Breaker Box
0133 00
1.
Install circuit breaker box (57), washer (59), and lower
bolt (58) on battery box (60).
2.
Tighten washer (56) and upper bolt (55) on circuit
breaker box (57).
3.
Install battery disconnect switch in circuit breaker box
(WP 0098 00).
4.
Install circuit breakers in circuit breaker box (WP
0053 00).
5.
Install hood tilt actuator switch in circuit breaker box
(WP 0059 00).
0133 00-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.