TM 5-3805-291-23-2
CHASSIS GUARD, SIDE PANELS, HYDRAULIC SERVICE BOX, CIRCUIT
BREAKER BOX, AND BATTERY BOX REPLACEMENT - CONTINUED
0133 00
INSTALLATION - CONTINUED
Circuit Breaker Box
0133 00
1.
Install circuit breaker box (57), washer (59), and lower
bolt (58) on battery box (60).
2.
Tighten washer (56) and upper bolt (55) on circuit
breaker box (57).
3.
Install battery disconnect switch in circuit breaker box
4.
Install circuit breakers in circuit breaker box (WP
5.
Install hood tilt actuator switch in circuit breaker box
0133 00-23