• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER REPLACEMENT - CONTINUED
ARCTIC HEATER REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  672    673    674    675    676  677  678    679    680    681    682  
img
TM 5-3805-291-23-2
ARCTIC HEATER REPLACEMENT - CONTINUED
0161 00
INSTALLATION - CONTINUED
6.
Position arctic heater (22) in case (7) and install eight washers (24) and four nuts (23) on case.
7.
Install new O-ring (17) and connect fuel hose (18) to
fitting (16).
8.
Connect coolant hoses (15 and 12) to fittings (14) and
tighten clamps (13).
9.
Connect three electrical connectors (10).
10.
Install new tiedown strap (11) on electrical connectors
(10).
11.
Position clip (19) on machine and install washer (21)
and bolt (20).
0161 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.