• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER REPLACEMENT - CONTINUED
ARCTIC HEATER INSTALLATION

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  674    675    676    677    678  679  680    681    682    683    684  
img
. .
TM 5-3805-291-23-2
ARCTIC HEATER REPLACEMENT - CONTINUED
0161 00
INSTALLATION - CONTINUED
14.
Open both arctic heater valves (1) on machine.
15.
Install left side cover (WP 0135 00) and handrails (WP 0134 00) on machine.
16.
Run engine and verify correct operation of heater system (TM 5-3805-291-10).
END OF WORK PACKAGE
0161 00-11/(0161 00-12 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.