• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER INSTALLATION - CONTINUED
ARCTIC HEATER INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  682    683    684    685    686  687  688    689    690    691    692  
img
TM 5-3805-291-23-2
ARCTIC HEATER INSTALLATION - CONTINUED
0162 00
REMOVAL CONTINUED
3.
Attach two mounting bars (9) to arctic heater case (10) with four bolts (12) and washers (11).
4.
Attach side cover (7) on arctic heater case (10) with two bolts (13) and washers (14).
5.
Attach boss (8) to side cover (7) with bolt (15) and washer (16).
6.
Position arctic heater case (10) and side cover (7) on machine level with step plate on counter weight.
7.
Tack weld mounting bars (9) and boss (8) on machine.
8.
Remove bolt (15), washer (16), two bolts (13), washers (14), and side cover (7) from arctic heater case (10) and
machine.
9.
Remove four bolts (12), washers (11), and arctic heater case (10) from machine.
10.
Finish welding two mounting bars (9) and boss (8) on machine.
11.
Weld boss (8) on frame.
N OT E
Paint all add-on parts as needed to match machine and protect bare metal.
12.
Install arctic heater case (10) on machine with four bolts (12) and washers (11).
0162 00-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.