TM 5-3805-291-23-2
ARCTIC HEATER INSTALLATION - CONTINUED
0162 00
INSTALLATION - CONTINUED
16.
Connect sending unit connector (23) to wiring harness
(22).
17.
Install nut (25), washer (26), and sending unit connec-
tor (23) on machine.
18.
Install new tiedown strap (27) on sending unit wire
(24).
19.
Remove four O-rings (31) from fittings (30). Discard
O-rings.
20.
Install four new O-rings (31) on fittings (30).
21.
Install two fittings (30) in arctic kit fuel tank (17).
22.
Connect hose assemblies (28 and 29) to fittings (30).
0162 00-12