• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPLACEMENT - CONTINUED
ENGINE REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  755    756    757    758    759  760  761    762    763    764    765  
img
TM 5-3805-291-23-2
ENGINE REPLACEMENT - CONTINUED
0171 00
REMOVAL - CONTINUED
40.
If equipped with arctic heater, disconnect three wiring
harnesses (87 and 88).
427-C1898
41.
Turn valve (89) to OFF position.
42.
Loosen clamp (90) and disconnect hose (91) from
valve (89).
43.
If equipped with arctic heater, turn valve (92) to OFF
position.
44.
If equipped with arctic heater, loosen clamp (93) and
disconnect hose (94) from valve (92).
427-C0498
45.
Remove vent (95) from fuel tank (96).
427-C1900
0171 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.