• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPLACEMENT - CONTINUED
COMPONENT TRANSFER - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  760    761    762    763    764  765  766    767    768    769    770  
img
.
TM 5-3805-291-23-2
ENGINE REPLACEMENT - CONTINUED
0171 00
COMPONENT TRANSFER
N OT E
It is highly recommended that component transfer be done with both engines side-by-side and that old
engine not be released until machine is operational.
1.
Remove bolt (108), washer (109), and clamp (110) from engine (15).
2.
Remove two bolts (111), washers (112), and bracket (113) from engine (15).
3.
Remove three nuts (114), washers (115), and brackets (116) from engine (15).
4.
Remove bolt (117), washer (118), and bracket (119) from engine (15).
5.
Remove three bolts (120), washers (121), and pump (44) with hoses still attached to engine (15).
N OT E
Tag all wiring harnesses and note location of tiedown straps and mounting hardware prior to disconnecting
to ensure correct installation.
6.
Disconnect connector (122), cut and discard all tiedown straps (123), and disconnect remaining connections.
7.
Remove four bolts (124), washers (125), and two brackets (126) from engine (15).
8.
Remove bolt (127), washer (128), and bracket (129) from engine (15).
427-C1910
0171 00-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.