• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT MAIN SEAL REPLACEMENT - CONTINUED
REAR MAIN SEAL REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  802    803    804    805    806  807  808    809    810    811    812  
img
.
TM 5-3805-291-23-2
FRONT MAIN SEAL REPLACEMENT - CONTINUED
0174 00
INSTALLATION
N OT E
Leave the shipping sleeve in place when installing front main seal. The front main seal must be installed
dry.
1.
Position new front main seal (3) on crankshaft (4).
2.
Push front main seal (3) into place. This will dislodge
shipping sleeve.
3.
Install five washers (2) and nuts (1) on front main seal
(3). Tighten nuts in numerical sequence as shown.
427-C0554
4.
Install crankshaft vibration damper (WP 0173 00).
5.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
6.
Shut down engine (TM 5-3805-291-10).
7.
Check for leaks.
END OF WORK PACKAGE
0174 00-3/(0174 00-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.