• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT MAIN SEAL REPLACEMENT - CONTINUED
REAR MAIN SEAL REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  803    804    805    806    807  808  809    810    811    812    813  
img
. . . . . . . . . . . . . . .
4
TM 5-3805-291-23-2
REAR MAIN SEAL REPLACEMENT
0175 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Direct Support
Gasket
Tools and Special Tools
O-ring (2)
Tool kit, general mechanic's, automotive (Item 90,
Seal
WP 0232 00)
Personnel Required
Shop equipment, automotive maintenance and
repair: field maintenance, basic, less power (Item
MOS 62B, Construction Equipment Repairer
68, WP 0232 00)
References
Materials/Parts
Cleaning compound, solvent, type III (Item 7, WP
TM 5-3805-291-10
0233 00)
WP 0176 00
Gasket cement (Item 14, WP 0233 00)
Equipment Conditions
Oil, lubricating, OE/HDO-5/40 (Item 27, WP 0233
00)
Flywheel removed (WP 0177 00)
Oil, lubricating, OE/HDO-15/40 (Item 28, WP
Drawings Required
0233 00)
Oil, lubricating, OEA-30, Arctic (Item 29, WP
TM 5-3805-291-23P, Figure 6
0233 00)
Estimated Time to Complete Task
Rag, wiping (Item 35, WP 0233 00)
Sealing compound (Item 38, WP 0233 00)
39.0 hr
0175 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.