• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RADIATOR REPLACEMENT - CONTINUED
FAN HYDRAULIC MOTOR AND FAN GROUP REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  892    893    894    895    896  897  898    899    900    901    902  
img
TM 5-3805-291-23-2
RADIATOR REPLACEMENT - CONTINUED
0191 00
INSTALLATION - CONTINUED
14.
Position hose (7) and install washer (5) and bolt (4) on
clamp (6).
427-C1930
15.
Connect hose (2) to aftercooler (3) and tighten clamp
(1).
427-C1929
16.
Fill cooling system slowly (WP 0041 00).
17.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
18.
Shut down engine (TM 5-3805-291-10).
19.
Check for leaks.
END OF WORK PACKAGE
0191 00-9/(0191 00-10 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.