• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Injector Cylinder 5 and 6 Jumper Harness.
INJECTOR CYLINDER 3 AND 4 JUMPER HARNESS REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  976    977    978    979    980  981  982    983    984    985    986  
img
. .
TM 5-3805-298-23-2
0212
CLEANING AND INSPECTION
000212
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0172).
END OF TASK
INSTALLATION
000212
1. Lubricate and install new O-ring (Figure 1, Item 10) on injector jumper harness connector (Figure 1, Item 3).
2. Position injector jumper harness (Figure 1, Item 9) to machine.
3. Install O-ring (Figure 1, Item 10), injector jumper harness connector (Figure 1, Item 3), and retaining ring
(Figure 1, Item 2) on valve cover base (Figure 1, Item 7).
4. Connect engine wiring harness connector (Figure 1, Item 1) on injector jumper harness connector
(Figure 1, Item 3).
NOTE
Install tiedown strap as noted during removal.
5. Install new tiedown strap (Figure 1, Item 4).
NOTE
Route and install wires and wiring harness as noted during removal.
6. Connect four injector jumper harness terminals (Figure 1, Item 5) and install four nuts (Figure 1, Item 6) on two
fuel injectors (Figure 1, Item 8).
END OF TASK
FOLLOW-ON TASKS
000212
1. Install valve cover (WP 0187).
2. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0212-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.