TM 5-3805-298-23-4
0399
INSTALLATION CONTINUED
NOTE
Route cable as noted during removal.
5. Position positive battery cable (Figure 12, Item 2) on machine.
NOTE
Install cables on starter as noted during removal.
6. Install two positive cables (Figure 12, Item 10), positive battery cable (Figure 12, Item 2),washer (Figure 7,
Item 8), and nut (Figure 12, Item 9) on starter (Figure 12, Item 6).
7. Position positive cable boot (Figure 12, Item 7) on nut (Figure 12, Item 9).
8. Install P-clamp (Figure 12, Item 15), washer (Figure 12, Item 11), bolt (Figure 12, Item 12), washer
(Figure 12, Item 14) and nut (Figure 12, Item 13) on positive battery cable (Figure 12, Item 2).
9. Install positive battery cable (Figure 12, Item 2), washer (Figure 12, Item 4), and nut (Figure 12, Item 3) on
secondary steering solenoid (Figure 12, Item 5).
10. Position positive cable boot (Figure 12, Item 1) on nut (Figure 12, Item 3).
0399-12