TM 5-3805-298-23-4
0413
INSTALLATION CONTINUED
NOTE
Remove caps or plugs and install hose as noted during removal.
Install tiedown straps as noted during removal.
Install P-clamp as noted during removal.
3. Install insulation (Figure 9, Item 1) and tiedown straps (Figure 9, Item 7) on hose (Figure 9, Item 6).
4. Position hose (Figure 9, Item 6) on machine. Install new O-ring (Figure 9, Item 3), hose (Figure 9, Item 6), and
tube nut (Figure 9, Item 4) on fitting (Figure 9, Item 5).
5. Install P-clamp (Figure 9, Item 2), washer (Figure 9, Item 9), and bolt (Figure 9, Item 8) on hose (Figure 9,
Item 6).
6. Install dual tiedown strap (Figure 9, Item 10) on hose (Figure 9, Item 6).
0413