Figure 9-10. Stowing and securing of 105-mm HE cartridges, lower hold No. 4, port side of shaft alley.
fore-and-aft axis of each load parallel with the center
d. Securing of 20-mm Cartridge Palletized Unit
line of the ship. Strip sheathing provides a suitable
Load. The 20-mm cartridge palletized unit load consists
bearing surface for loads placed along the side of the
hold. Significant lateral displacement of the unit loads
mounted on metal materials-handling pallet, MIK 12
from tier-to-tier is caused by hull sheer. Consequently,
MOI) 0. The unit load weighs 3,800 pounds and is
vertical shoring in the form of a table is required for the
approximately 35 cubic feet in volume. Block stowage
first tier at the end of the row, since it spans a void that
or sweatboard-to-sweatboard stowage is possible in any
exceeds the minimum allowable width of 3 feet. All
hold of a ship, as well as in deep tanks and on the
voids in the top tiers are fully blocked, including those
weather deck.
along the strip sheathing. Partial encasement of the
illustrates
three-high
stanchion and ladder is adequate for this type of load.
sweatboard-to-sweatboard stowage of the unit load in
lower hold number 1, as viewed forward of the hatch,
starboard to port. The unit loads are stowed with the
9-13