TM 55-607/NAVSEA OP 3221 Rev 2
Figure 9-9. Construction of a full floor over 105-mm HE cartridges.
loading adjacent to low overhead structural members
(5) Unit loads of 105-mm cartridges can be
are also indicated.
stowed in lower holds bisected by the shaft alley, as
9-12