TM 55-607/NAVSEA OP 3221 Rev 2
the unit loads. Additional 2- by 3-inch lacing will be
instead, the bomb loads were emplaced before
dunnaging. Hence, face boards are not illustrated on
added to complete the structures. Figure 9-43 illustrates
nonprefabricated securing structures installed at the hull.
the structure
In this case, prefabricated construction was not used;
Figure 9-41. Simple block stowage of 500-pound-bomb Unit loads, lower hold No. 5 (hull blocking technique).
9-51