• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 34. Bracket.
COOLANT PACK MAINTENANCE

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  55    56    57    58    59  60  61    62    63    64    65  
img
. . . . . .
TM 5-2420-231-23-2
0091
INSTALLATION CONTINUED
41. Install aspirate check valve hose (Figure 35, Item 3) on machine.
42. Connect aspirate check valve hose (Figure 35, Item 3) and tighten clamp (Figure 35, Item 2) on muffler
(Figure 35, Item 1).
Figure 35. Aspirate Check Valve Hose.
0091
END OF TASK
FOLLOW-ON TASKS
0091
1. Install starter (WP 0152).
2. Install alternator (WP 0153).
3. Check throttle cable adjustment (WP 0085).
4. Install air cleaner assembly (WP 0100).
5. Install coolant pack (WP 0092).
6. Fill engine with oil (WP 0126).
7. Bleed fuel system (WP 0085).
8. Check operation of engine (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE
0091-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.