TM 5-2420-231-23-2
0092
INSTALLATION CONTINUED
19. Connect upper radiator hose (Figure 51, Item 3) to thermostat housing (Figure 51, Item 1) and tighten clamp
(Figure 51, Item 2).
Figure 51. Upper Radiator Hose.
0092
END OF TASK
FOLLOW-ON TASKS
0092
2. Charge A/C system (WP 0364).
3. Install hood (WP 0302).
4. Check hydraulic oil level (TM 5-2420-231-10).
5. Check transmission oil level (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE