• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Alternator and Bracket.
MAIN CHASSIS WIRING HARNESS REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  412    413    414    415    416  417  418    419    420    421    422  
img
. .
TM 5-2420-231-23-2
0153
INSTALLATION CONTINUED
NOTE
Route drive belt as noted during removal.
12. Rotate drive belt tensioner (Figure 7, Item 1) clockwise and install drive belt (Figure 7, Item 2) on alternator pul-
ley (Figure 7, Item 3) and drive belt tensioner (Figure 7, Item 1).
13. Release drive belt tensioner (Figure 7, Item 1).
Figure 7. Drive Belt Tensioner.
0153
END OF TASK
FOLLOW-ON TASKS
0153
1. Reconnect batteries (WP 0157).
2. Lower engine hood (TM 5-2420-231-10).
3. Disengage and stow safety support strut, and lower front end loader (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE
0153-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.