• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 52. Fuel Lines.
Figure 54. Wiring Harness.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  889    890    891    892    893  894  895    896    897    898    899  
img
.
TM 5-2420-231-23-2
0213
INSTALLATION CONTINUED
66. Connect hose (Figure 53, Item 7) and tighten clamp (Figure 53, Item 6) on engine.
67. Connect wiring harness connector (Figure 53, Item 8) to heater grid (Figure 53, Item 9).
68. Install cable (Figure 53, Item 3), washer (Figure 53, Item 1), and nut (Figure 53, Item 2) on heater grid
(Figure 53, Item 9).
69. Install new tiedown strap (Figure 53, Item 4) on lift eye (Figure 53, Item 5).
Figure 53. Heater Grid.
0213
0213-50


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.